CLOSE

Specials

  • Construction Middle East
  • Construction Demolition and Recycling APAC
  • Architectural Glass APAC
  • Startups APAC
  • Construction Forensic Services
  • Flooring System
  • Waterproofing APAC
  • Wall Systems
  • Safety and Compliance Europe
  • Roofing Systems
  • Construction Executive Search
  • Construction Engineering
  • Roofing Systems Europe
  • Project Management Europe
  • testin
  • MENA
  • Safety and Compliance APAC
  • Civil Engineering
  • Air Quality
  • Commercial Concrete
  • Cladding Systems
  • Construction Equipment
  • Mechanical Electrical and Plumbing
  • Marine Construction
  • Steel Building
  • Bridge Construction
  • Construction Demolition
  • Safety and Compliance
  • HVAC
  • Others
  • Construction and Bid Estimation
  • Green Building Solutions
  • Interior Design
  • Dry Construction
  • Roofing Tech
  • Construction Demolition and Recycling
  • Flooring Tech
  • Building Information Modeling
  • Steel Building Apac
  • Construction Tech
  • MODULAR CONSTRUCTION
  • Elevators and Escalators
  • Architectural Glass
  • Europe
  • APAC
  • Roofing System APAC
  • Construction Demolition and Recycling Europe
  • Modular Construction Europe
  • Plumbing System
  • Door Systems
  • Underground Construction Solutions

I agree We use cookies on this website to enhance your user experience. By clicking any link on this page you are giving your consent for us to set cookies. More info

Skip to: Curated Story Group 1
constructionbusinessreview
US
EUROPE
APAC
  • Home
  • Contributors
  • News
  • Conferences
  • Newsletter
  • Magazine
  • About

Thank you for Subscribing to Construction Business Review Weekly Brief

×
#

Construction Business Review Weekly Brief

Be first to read the latest tech news, Industry Leader's Insights, and CIO interviews of medium and large enterprises exclusively from Construction Business Review

Subscribe

loading
  • Home
  • Contributers

Recommended Insights

BIM in 2020

Reinardt Bronkhorst, Senior BIM Lead, SSH

CEQS: A Vision for the Future Role of Cost...

Eugene Seah, Senior Director, Key Account...

Construction Industry and the New World

Thomas Gröninger, Project Manager, Large...

Cybersecurity Of Hvac Systems In The Era...

Matthew T. Goss, PE, PMP, CEM, CEA, CDSM,...

To Curb Climate Change and Design for...

Rebecca Delaney, P.E., Associate Director...

Projects Today Come Down To Nerves Of...

Jason D’Orlando, Senior Managing...

Key Challenges in Managing Construction...

Jonathan Shamrock, Technical Director,...

Technology, Purpose and the Office

Angela Spathonis, Principal & Managing...

BIM in 2020

Reinardt Bronkhorst, Senior BIM Lead, SSH

CEQS: A Vision for the Future Role of Cost...

Eugene Seah, Senior Director, Key Account...

Construction Industry and the New World

Thomas Gröninger, Project Manager, Large...

Cybersecurity Of Hvac Systems In The Era...

Matthew T. Goss, PE, PMP, CEM, CEA, CDSM,...

To Curb Climate Change and Design for...

Rebecca Delaney, P.E., Associate Director...

Projects Today Come Down To Nerves Of...

Jason D’Orlando, Senior Managing...

Key Challenges in Managing Construction...

Jonathan Shamrock, Technical Director,...

Technology, Purpose and the Office

Angela Spathonis, Principal & Managing...

Building Design flexibility a solution for the project and a hope for the planet

Moad ZIADI, Director of Construction Projects Europe at Unibail-Rodamco-Westfield
Tweet

Some projects are by nature a source of permanent evolutionduring the project stage but also during the operation stage, retail, hotels, and offices are the most prominent examples of thisfact, which is not always easy to manage with the various stakeholders.


Designing for flexibility is the best solution to address this issue;however, the design flexibility is more effective when it is initiated in the primary stage of the project.It must be one of the main inputs for the design team before the project begins.


The main goalis to be able to set the various recommendations allowing to limit or even considerably reduce the impact of a design change during the project stage and during the asset life cycle.It is a sort of a toolbox that I would like to share with the readers of this magazine resulting from my experience on design and built projects.


During the project stage, flexibility must be able to respond to “last minute” adaptations such as requests from tenants during the leasing process, which generally accompanies the project stage, but also requests from public authorities, orfire departments, or any change in the program from the project owner or investor.


The era of Greenfields is starting to be over; flexibility and adaptation make it possible to reduce the costs of construction in urban facilities


During the operation stage, inputsinto the existing design comes mainly from the rotation of tenants’ premises, the change of operators or during the extension,renovation, restructuration, and densification of assets.


The wave of Covid-19 has raised a serious question about the transformation of Parisian offices into housing, student residences, or even hotels. In the end, the transformation turned out to be easier in the oldHaussmannian buildings than in modern buildings with curtain wall facades, high ceilings, and mechanical ventilation. The reason for that is that the new modern buildings designed since the second half of the last centuryfocused more on product requirement aspects and reducing operating costs without taking into consideration the future building transformations.


Providing flexibility to meet these requirements is to avoid significant additional costs, jeopardizing the financial feasibility of the project transformation,but also to avoid prolonging the project deliverywhen building transformation is requested.


For both the building operation stage and later when remodelingthe building, design flexibility also offersan environmental value:It allows alignment with the building's life cycle, it favors the easy replacement of materials, recycling the removed ones, and it provides precautionary measures to avoid heavy reinforcement of the structure,more generous mechanical and electricalcapacities and more carbon impacting installations.


My experience on this subject when designinga retail product,for example,resultedin the use of timber slabs or concrete cast in situ slabs for any retail / retail floor, as this more suitable than pre-stressed hollow core slabs to make connections between two levels occupied by the same lessee. I also found a structural floor slab designed without beams such as the waffle slabs or the use of beams with recesses are good designs for better flexibility of MEP networks.


In this category I also found useful the followingconservatory measures to allowflexibility when changing functionalities:


- Sizing the structure with a margin of conservative measures and in particular the parking located in the upper building structure that could be converted in the future to office, hotel,and commercial areas, or reinforcing inaccessible roofs allowing any future conversion or building heightening. It is certainly not necessary to oversize everything but rather target the most difficult structure to reinforce and prioritizethe zones susceptible to undergo these changes.


- On the MEP, the design of the technical shafts and raisers that should be accessible and should have larger sizes allowing the incorporation of new installations and the easy intervention on the existing networks. I will add to this that it is necessary to prioritize the compartmentalization: More small capacity unitsrather than large capacity units (it is better to have 2 small air handling units rather than 1 big air handling unit) ...


- Likewise for the plumbing it has always been better to use flexible conducts rather than rigid ducts.


- And finally, to facilitate the future coordination and decrease the number of concrete drills, it is always better to plan and identify hollow block boxes in structural concrete walls and slabs to ease future design and construction coordination.


- For architectural trades, architects and decorators should favor simplicity and frugality as this allows formore flexibility than complex heavy design.The use of small-sized prefabricated elements is much more suited to changes; for example, tiles should be favored.


All these measures can only be effective with the use of BIM technology; an asset must have its own digital model allowing designers to locate and identify these flexibilitiesto better view the existing building when starting new restructuration or renovation.This will reduce the cost and the schedule of the modification, will have less impact on the building during restructuring and renovation but above all, allow the adoption of a circular economy strategy.


The future of construction will pass through these stages: frugal design, digitization of construction with BIM, use of this digital model to monitor the building's operation, its life cycle, its renovation and ultimately its transformation. The era of Greenfields is starting to be over; flexibility and adaptation make it possible to reduce the costs of construction in urban facilities and ultimately this will lead to a great hope for the planet: A greener construction.


Check Out This : Proptech Solution Companies


Weekly Brief

loading
Top 10 Construction Service Companies in Middle East - 2021
Top 10 Construction Solution Companies in Middle East – 2021
Top 10 Construction Consulting Companies in Middle East – 2021
> <
  • Construction Middle East 2021

    Top Vendors

    Current Issue

Read Also

Construction Industry and the New World

Thomas Gröninger, Project Manager, Large and Mega Projects, STRABAG AG (STR: VIE)
Construction Industry and the New World

Cybersecurity Of Hvac Systems In The Era Of Connected Devices

Matthew T. Goss, PE, PMP, CEM, CEA, CDSM, LEED® AP(BD+C), MEP/Energy Practice Leader, CDM Smith
Cybersecurity Of Hvac Systems In The Era Of Connected Devices

To Curb Climate Change and Design for Whole Life Carbon, the HVAC Industry Needs a More Transparent Roadmap

Rebecca Delaney, P.E., Associate Director and Operations Leader for Sustainable Engineering Studio, and Luke Leung P.E., ASHRAE Fellow, LEED Fellow, BEMP, P Eng, Director of Sustainable Engineering Studio, Skidmore, Owings and Merrill
To Curb Climate Change and Design for Whole Life Carbon, the HVAC Industry Needs a More Transparent Roadmap

BIM in 2020

Reinardt Bronkhorst, Senior BIM Lead, SSH
BIM in 2020
CEQS: A Vision for the Future Role of Cost Engineers and Quantity Surveyors

CEQS: A Vision for the Future Role of Cost Engineers and Quantity Surveyors

Eugene Seah, Senior Director, Key Account Management, Surbana Jurong
 Projects Today Come Down To Nerves Of Steel And Realistic Expectations

Projects Today Come Down To Nerves Of Steel And Realistic Expectations

Jason D’Orlando, Senior Managing Director, Life Sciences Project & Development Services Michael Morehead, Senior Director, Industrial Project & Development Services

Key Challenges in Managing Construction and Demolition Waste

Jonathan Shamrock, Technical Director, Tonkin & Taylor Ltd
Key Challenges in Managing Construction and Demolition Waste

Technology, Purpose and the Office

Angela Spathonis, Principal & Managing Director, Gensler Singapore
Technology, Purpose and the Office
Loading...

Copyright © 2022 Construction Business Review . All rights reserved. |  Subscribe follow on linkedin

This content is copyright protected

However, if you would like to share the information in this article, you may use the link below:

https://construction-middle-east.constructionbusinessreview.com/cxoinsight/building-design-flexibility-a-solution-for-the-project-and-a-hope-for-the-planet-nwid-698.html